Nyamyotsi Project – Stage II
| |

Nyamyotsi Project – Stage II

Nyamyotsi Mini Hydropower Project – Stage II Client UNIDO Location Nyadihu District, Republic of Rwanda Capacity [kW] 100 Beneficiaries 250 Households Transmission Voltage 400 V Distribution N/W 3km at 230V Channel Length 200 m Penstock Length 250 m Design Flow 90 Litre/sec Gross Head 120 m Commissioned in July 2012

Nyamyotsi Project – Stage I
| |

Nyamyotsi Project – Stage I

Nyamyotsi Mini Hydropower Project – Stage I Nyamyotsi hydropower project is located in the Rugera Sector on Nyadihu District in the Western Rwanda. Previously this province was called as the Ruhengeri Province. This project was identified by the team of UNIDO and local experts in the year 2004 and it was developed by UNIDIO, which…