| Client | Kenya Tea Development Agency Holdings Limited, Republic of Kenya |
| Capacity | 1.8 MW |
| Location | Embu County, Republic of Kenya |
| Project Type | EPC |
Similar Posts
Transmission Line Project from Habarana to Veyangoda
ByadminConstruction of 220 kV Transmission Line Project from Habarana to Veyangoda
Sri Lanka visit by Burundi Govurment Officials
ByadminMinister of Community Development of Burundi – Jean Baptiste Gahimbare and Director General of Water Supply & Energy for Rural Areas in Burundi – Ndayitwayeko Fulgence inspected several Mini Hydropower Projects in Deraniyagala and Nawalapitiyain July 2005, to assess the developments in the hydropower sector in Sri Lanka before they sign the Agreement with UNIDO….
Nyamyotsi Project – Stage I
ByadminNyamyotsi Mini Hydropower Project – Stage I Nyamyotsi hydropower project is located in the Rugera Sector on Nyadihu District in the Western Rwanda. Previously this province was called as the Ruhengeri Province. This project was identified by the team of UNIDO and local experts in the year 2004 and it was developed by UNIDIO, which…
Hydropower Projects in Rwanda – On the Invitation of MININFRA
ByadminObserving the success of UNIDO Projects handled by ENCO (Pvt) Ltd., the Ministry of Infrastructure of the Government of Rwanda (MININFRA) invited us to design and build 8 new grid connected and off grid hydropower schemes along Rwanda’s North-South Central Mountain Range, with a total generation capacity of 6.35 MW. Site Visit carried out by…
Feasibility Study in Guinea
ByadminThe feasibility study of Guinea Project was completed successfully and handed over by ENCO (Pvt) Ltd. This is also a project funded by UNIDO. The proposed dam of the Hydro Power plant across Makona River is situated close to the village called “Keno” in the city called Gueckedou. The Makona River finally falls into the…
KalawaAragam 10MW Biomass Power Plant
ByadminConstruction at KalawaAragam 10MW Biomass Power Plant, Monaragala Client Green Watts (Private) Limited Period Year 2018 ~ 2019 Constructions Carried out Project Cost Chimney Foundation, Flue duct foundation, Heat pipe foundation, Duster platform, Reducer Foundation, Circular pump equipment foundation LKR 11,833,813.00 Canteen Building LKR 10,636,368.59 Retaining Wall construction LKR 5,063,241.95 Hydraulic House, Tilting…







