Completely constructed the Access Road of “Sri Jayathilakarama Temple” of Metibemiya, Hanguranketha, and donated it to the Temple on 24/12/2017. This was the only road leading to the Temple which was in a poor state, prior to the road construction.
![](https://i0.wp.com/hpi.lk/wp-content/uploads/2021/10/MAF2D71.jpg?fit=480%2C640&ssl=1)
Similar Posts
![Hydropower Projects in Rwanda – On the Invitation of MININFRA](https://i0.wp.com/hpi.lk/wp-content/uploads/2021/10/3.3.2.1_MININFRA-Hydropower-Projects-in-Rwanda_Map.jpg?fit=768%2C497&ssl=1)
Hydropower Projects in Rwanda – On the Invitation of MININFRA
Observing the success of UNIDO Projects handled by ENCO (Pvt) Ltd., the Ministry of Infrastructure of the Government of Rwanda (MININFRA) invited us to design and build 8 new grid connected and off grid hydropower schemes along Rwanda’s North-South Central Mountain Range, with a total generation capacity of 6.35 MW. Site Visit carried out by…
![Mutubo Project](https://i0.wp.com/hpi.lk/wp-content/uploads/2021/10/Mutobo-DSC04503.jpg?fit=768%2C432&ssl=1)
Mutubo Project
Mutubo Mini Hydropower Project Client UNIDO Location Ruhangeri, Republic of Rwanda Capacity [kW] 200 Beneficiaries 350 Households Transmission Voltage 11 kV Distribution N/W 6km at 230V Channel Length 600 m Penstock Length 180 m Design Flow 90 Litre/sec Gross Head 120 m Commissioned in May 2010
![Nyamyotsi Project – Stage I](https://i0.wp.com/hpi.lk/wp-content/uploads/2021/10/Nyamyotsi-I_3-Nov-visit-173.jpg?fit=768%2C576&ssl=1)
Nyamyotsi Project – Stage I
Nyamyotsi Mini Hydropower Project – Stage I Nyamyotsi hydropower project is located in the Rugera Sector on Nyadihu District in the Western Rwanda. Previously this province was called as the Ruhengeri Province. This project was identified by the team of UNIDO and local experts in the year 2004 and it was developed by UNIDIO, which…