Client | Kenya Tea Development Agency Limited, Republic of Kenya |
Capacity | 1.5 MW |
Location | Meru County, Republic of Kenya |
Project Type | EPC/Turnkey |

Similar Posts

Manelwala Project – 2.4 MW
Manelwala Mini Hydro-power Project – 2.4 MW Manelwala was completed by HPI in June 2008 as an EPC Contract. The main investor for the projects was Manelwala Hydro Power (Pvt)Ltd., which is same as Panasian Power (Pvt) Ltd. with joint investment with HPI and New Energy Ltd. in United Kingdom. Type of Contract Turn Key…

Transmission Line Project from Habarana to Veyangoda
Construction of 220 kV Transmission Line Project from Habarana to Veyangoda

Wee Oya Project – 6 MW
Wee Oya Mini Hydro-power Project – 6 MW Wee Oya is another successful mini hydro project developed by HPI for Power base Technology (Pvt) Ltd. and the second mini hydro plant developed by HPI with them. This clearly shows the confidence our clients have placed on us. The mother company of the Power base, Naturub…

Village Hydropower Projects – Sri Lanka
Dr.Nishantha Nanayakkara being an academic at the Moratuwa University of Sri Lanka attached to the Electrical Department found the necessity of inputs to society soon after he came back to Sri Lanka in 1995 after finishing all his post-graduate studies. 1996/97 had been the worst era of the electricity sector in Sri Lanka with 10-15…

Soranethota Project – 1.4 MW
Soranethota Mini Hydro-power Project – 1.4 MW Soranethota hydro power project was developed by HPI for Access Energy (Pvt) Ltd. in Badulla. Project was successfully commissioned in December 2008 with the installed capacity of 1.4 MW.

Nyamyotsi Project – Stage II
Nyamyotsi Mini Hydropower Project – Stage II Client UNIDO Location Nyadihu District, Republic of Rwanda Capacity [kW] 100 Beneficiaries 250 Households Transmission Voltage 400 V Distribution N/W 3km at 230V Channel Length 200 m Penstock Length 250 m Design Flow 90 Litre/sec Gross Head 120 m Commissioned in July 2012