| Client | Kenya Tea Development Agency Limited, Republic of Kenya |
| Capacity | 1.5 MW |
| Location | Meru County, Republic of Kenya |
| Project Type | EPC/Turnkey |
Similar Posts
Rupingazi Small Hydro Electric Power Project
ByadminClient Kenya Tea Development Agency Holdings Limited, Republic of Kenya Capacity 1.8 MW Location Embu County, Republic of Kenya Project Type EPC
Factory Expansion
ByadminFactory Expansion of RSL Ceramics Due to the high demand for our ceramics bath ware products, we are now in the process of expanding our Factory with modern European technological aspects. This is a project worth LKR 100 Mn. which is handling by Hydro Power International (Private) Limited. Constructions are going on in a 01…
Manakola Project
ByadminManakola Mini Hydro-power Project – 2.5 MW This Project is an idea of Dr. Nanayakkara and his Engineering Team. This Power Plant is located in Hanguranketha DS Division in Nuwara Eliya District and the Water of Beliul Oya, which is a tributary of Mahaweli River, is used near Elamulla village in order to harness renewable…
Scoping & Feasibility Studies in the Republic of Liberia
ByadminClient Ministry of Lands, Mines, and Energy, Republic of Liberia Sites 1. Jor River at Gbatala, Bong County 2. Du River at Kakata, Margibi County 3. Cestors River between Grand bassa and Sinoe Counties 4. St. John River at Gbedin, Nimba County 5. Dugbe River in River Gee County 6. Wozi Creek in Zorzor,…
Niriella Mini Hydropower Project – 3 MW
ByadminNiriella Mini Hydropower Project – 3 MW Trailed by the success of the Kabaragala Mini Hydro Project, HPI was awarded to construct another Turnkey Project in Niriella by the Naturub Group of Companies. This project was commissioned in September 2002 with a total generating capacity of 3 MW. Power base Technology (Pvt) Ltd. is the…
Nyamyotsi Project – Stage II
ByadminNyamyotsi Mini Hydropower Project – Stage II Client UNIDO Location Nyadihu District, Republic of Rwanda Capacity [kW] 100 Beneficiaries 250 Households Transmission Voltage 400 V Distribution N/W 3km at 230V Channel Length 200 m Penstock Length 250 m Design Flow 90 Litre/sec Gross Head 120 m Commissioned in July 2012


















