| Client | Kenya Tea Development Agency Limited, Republic of Kenya |
| Capacity | 1.5 MW |
| Location | Meru County, Republic of Kenya |
| Project Type | EPC/Turnkey |
Similar Posts
Mutubo Project
ByadminMutubo Mini Hydropower Project Client UNIDO Location Ruhangeri, Republic of Rwanda Capacity [kW] 200 Beneficiaries 350 Households Transmission Voltage 11 kV Distribution N/W 6km at 230V Channel Length 600 m Penstock Length 180 m Design Flow 90 Litre/sec Gross Head 120 m Commissioned in May 2010
Kabaragala Project
ByadminKabaragala Mini Hydro-power Project – 2.25 MW Kabaragala Mini Hydro Power project is the maiden turnkey project handled by HPI which is located at the far end of Nuwaraeliya. HPI handled all electro-mechanical and civil works of the project from grass root level and successfully commissioned it in May 2001 with a total generating capacity…
Feasibility Study in Guinea
ByadminThe feasibility study of Guinea Project was completed successfully and handed over by ENCO (Pvt) Ltd. This is also a project funded by UNIDO. The proposed dam of the Hydro Power plant across Makona River is situated close to the village called “Keno” in the city called Gueckedou. The Makona River finally falls into the…
Manakola Project
ByadminManakola Mini Hydro-power Project – 2.5 MW This Project is an idea of Dr. Nanayakkara and his Engineering Team. This Power Plant is located in Hanguranketha DS Division in Nuwara Eliya District and the Water of Beliul Oya, which is a tributary of Mahaweli River, is used near Elamulla village in order to harness renewable…
Soranethota Project – 1.4 MW
ByadminSoranethota Mini Hydro-power Project – 1.4 MW Soranethota hydro power project was developed by HPI for Access Energy (Pvt) Ltd. in Badulla. Project was successfully commissioned in December 2008 with the installed capacity of 1.4 MW.
Nyamenga Mini Hydropower Plant – Burundi
ByadminWe could win another competitive contract to upgrade the Nyamenga hydropower plant in the neighbouring nation of Burundi, from an existing capacity of 1.4 MW to 2.8 MW with two additional turbine-generator sets. This plant augmentation was successfully completed and commissioned in June 2009.