A Project on Solar Power Systems at RSL Ceramics Factory Premises, Homagama
| Capacity | 100.17 kW |
| Project Type | Supply, installation and Commissioning under Net Plus Scheme |
| Completion Year | 2017 |
| Solar Panel Provider& Technology Transfer | Alta Vision Solar |

A Project on Solar Power Systems at RSL Ceramics Factory Premises, Homagama
| Capacity | 100.17 kW |
| Project Type | Supply, installation and Commissioning under Net Plus Scheme |
| Completion Year | 2017 |
| Solar Panel Provider& Technology Transfer | Alta Vision Solar |



We could win another competitive contract to upgrade the Nyamenga hydropower plant in the neighbouring nation of Burundi, from an existing capacity of 1.4 MW to 2.8 MW with two additional turbine-generator sets. This plant augmentation was successfully completed and commissioned in June 2009.
Manakola Mini Hydro-power Project – 2.5 MW This Project is an idea of Dr. Nanayakkara and his Engineering Team. This Power Plant is located in Hanguranketha DS Division in Nuwara Eliya District and the Water of Beliul Oya, which is a tributary of Mahaweli River, is used near Elamulla village in order to harness renewable…
Provided financial assistance for the renovation of “Sri Wivekaramaya Temple” of MaditthaKumbura, Manakola and completely handled fixing electric lamps around the Temple area in the year 2019 & continuously monitor the electrical issues.
Wee Oya Mini Hydro-power Project – 6 MW Wee Oya is another successful mini hydro project developed by HPI for Power base Technology (Pvt) Ltd. and the second mini hydro plant developed by HPI with them. This clearly shows the confidence our clients have placed on us. The mother company of the Power base, Naturub…
Purpose; to introduce KUBOTA’s domestic sewerage treatment facility called Joukasou systems In the latter part of 2018, Fukada Environmental Development Industries Co., Ltd. (Japan), expressed interest in joining hands with us to introduce Japanese technology for sewerage/ kitchen water treatment facilities using KUBOTA’s technology which is the best in the world and affordable with good quality…
Upper Korawak Oya Mini Hydro-power Project – 1.5 MW Upper Korawak Oya hydro power project was developed by HPI for Santak Power (Pvt) Ltd. in Nawalapitiya. Project was successfully commissioned in January 2006 with the installed capacity of 1.5 MW. Upper Korawaka Oya is one of the five parallel projects handled between 2004-2005 by HPI….