| |

Transmission Line Project from Habarana to Veyangoda

Similar Posts

  • | |

    Wee Oya Project – 6 MW

    Wee Oya Mini Hydro-power Project – 6 MW Wee Oya is another successful mini hydro project developed by HPI for Power base Technology (Pvt) Ltd. and the second mini hydro plant developed by HPI with them. This clearly shows the confidence our clients have placed on us. The mother company of the Power base, Naturub…

  • | |

    Nyamyotsi Project – Stage II

    Nyamyotsi Mini Hydropower Project – Stage II Client UNIDO Location Nyadihu District, Republic of Rwanda Capacity [kW] 100 Beneficiaries 250 Households Transmission Voltage 400 V Distribution N/W 3km at 230V Channel Length 200 m Penstock Length 250 m Design Flow 90 Litre/sec Gross Head 120 m Commissioned in July 2012

  • UNIDO Projects

    We have expanded our activities beyond Sri Lankan territory to cover the African region in 2005 and accordingly United Nations Industrial Development Organization (UNIDO) awarded ENCO (Pvt) Ltd., One of the Associate companies of Hydro Power International (Pvt) Ltd. to construct a village hydro project in Rwanda, namely Nyamyotsi 1. Trailed by the success of…

Leave a Reply