Construction of 220 kV Transmission Line Project from Habarana to Veyangoda
Similar Posts
TPA Representatives Visit in Sri Lanka in 2016
ByadminRepresentatives of “Terra People’s Association of Japan”, Ms. Ruri Okubo, Mr. Yamaji Kenzo, and 02 respectable donors including Mr. KasuoShingae visited Sri Lanka in March ’2016 to meet the scholarship holders of Shishyodaya Foundation. This event was successfully held with the participation of the…Principal of Sanghamitta College, Galle – Mrs. ChandaniUdakumbura, Teachers-In-Charge – Mrs. Chandima…
Davora Capital (Private) Limited
ByadminThe isle of Sri Lanka is bountiful geography, blessed with many springs, rivers, and waterfalls that are nourished by the showers that pour throughout the year. As a pioneer in Renewable Energy Development, we have made use of our gifts from Mother Nature and transformed them into Hydropower Plants. Davora Capital Group has been in…
Pre-feasibility Studies on Hydropower potential in Japan
ByadminClient ZE Energy Inc., Japan Location Toyama Prefecture Sites 1. Nimangoko Irrigation Scheme 2. Kobutamata River 3. Yamada River 4. Itadoni River 5. Mitani Rivers 6. Gyadani River 7. Wakatsuchi River Commissioned In November 2014
Gatubwe Project
ByadminGatubwe Mini Hydropower Project Client UNIDO Location Agatobe, Republic of Rwanda Capacity [kW] 200 Beneficiaries 350 Households Transmission Voltage 11 kV Distribution N/W 10km at 230V Channel Length 500 m Penstock Length 30 m Design Flow 1500 Litre/sec Gross Head 18 m Commissioned in July 2012
Kiruwana Oya Project
ByadminKiruwana Oya Mini Hydro-power Project – 0.6 MW The project utilizes the waters of Kiruwana Oya in the Matara District in Sri Lanka to generate 0.6 MW of Electricity. The Project was developed by Nilwalabase Hydro Power (Pvt) Ltd., which was incorporated in 2004, mainly for developing grid-connected small power projects. The main investor of…
Soranethota Project – 1.4 MW
ByadminSoranethota Mini Hydro-power Project – 1.4 MW Soranethota hydro power project was developed by HPI for Access Energy (Pvt) Ltd. in Badulla. Project was successfully commissioned in December 2008 with the installed capacity of 1.4 MW.