| Client | Rural and Renewable Energy Agency, Republic of Liberia |
| Capacity | 2.5 MW |
| Location | Lofa County, Republic of Liberia |
| Project Type | Supply & Installation |
| Remarks | The contract is awarded to the JV of ENCO, HPI & FUSO |
Similar Posts
Upper Korawak Oya Project – 1.5 MW
ByadminUpper Korawak Oya Mini Hydro-power Project – 1.5 MW Upper Korawak Oya hydro power project was developed by HPI for Santak Power (Pvt) Ltd. in Nawalapitiya. Project was successfully commissioned in January 2006 with the installed capacity of 1.5 MW. Upper Korawaka Oya is one of the five parallel projects handled between 2004-2005 by HPI….
Nyamyotsi Project – Stage II
ByadminNyamyotsi Mini Hydropower Project – Stage II Client UNIDO Location Nyadihu District, Republic of Rwanda Capacity [kW] 100 Beneficiaries 250 Households Transmission Voltage 400 V Distribution N/W 3km at 230V Channel Length 200 m Penstock Length 250 m Design Flow 90 Litre/sec Gross Head 120 m Commissioned in July 2012
Davora Capital (Private) Limited
ByadminThe isle of Sri Lanka is bountiful geography, blessed with many springs, rivers, and waterfalls that are nourished by the showers that pour throughout the year. As a pioneer in Renewable Energy Development, we have made use of our gifts from Mother Nature and transformed them into Hydropower Plants. Davora Capital Group has been in…
Pre-feasibility Studies on Hydropower potential in Japan
ByadminClient ZE Energy Inc., Japan Location Toyama Prefecture Sites 1. Nimangoko Irrigation Scheme 2. Kobutamata River 3. Yamada River 4. Itadoni River 5. Mitani Rivers 6. Gyadani River 7. Wakatsuchi River Commissioned In November 2014
Monastery for Buddhist Monks
ByadminBuild Chambers in Kalawana Area, a really calming place boarded to Sinharaja Forest and offered to Meditative Buddhist Monks in November 2017.
New Showroom Opening for RSL Ceramics
ByadminVenue: Godagama Date: 25-Sep-2015














