Client | Kenya Tea Development Agency Holdings Limited, Republic of Kenya |
Capacity | 1.8 MW |
Location | Embu County, Republic of Kenya |
Project Type | EPC |

Similar Posts

Solar Power Systems at Veddagala Factory
A Project on Solar Power Systems at Veddagala Factory Premises, Kalawana. Capacity 101.25 kW Project Type Supply. installation and Commissioning under Net Plus Scheme Completion Year 2018 Solar Panel Provider & Technology Transfer Alta Vision Solar

Davora Corporate Cricket Match
Venue: Galle Date: 22-Mar-2015

Kaiha 2 Small Hydro-power Plant
Client Rural and Renewable Energy Agency, Republic of Liberia Capacity 2.5 MW Location Lofa County, Republic of Liberia Project Type Supply & Installation Remarks The contract is awarded to the JV of ENCO, HPI & FUSO

Mutubo Project
Mutubo Mini Hydropower Project Client UNIDO Location Ruhangeri, Republic of Rwanda Capacity [kW] 200 Beneficiaries 350 Households Transmission Voltage 11 kV Distribution N/W 6km at 230V Channel Length 600 m Penstock Length 180 m Design Flow 90 Litre/sec Gross Head 120 m Commissioned in May 2010

Access Road of Sri Jayathilakarama Temple, Hanguranketha
Completely constructed the Access Road of “Sri Jayathilakarama Temple” of Metibemiya, Hanguranketha, and donated it to the Temple on 24/12/2017. This was the only road leading to the Temple which was in a poor state, prior to the road construction.

Gammaduwa(A Cultural Event)
Annually organize this event by RSL Ceramics (Private) Limited, by wishing the blessings of Goddess Pattini on the Village and villagers for the continuity of happiness, safety, and harmony. This is a cultural event based on historical stories and people’s believes.