Organize Health Campaigns annually as Social Welfare Projects in Remote Areas in Akuressa – Matara for Eye Testing & Identification of Non-Transferrable Diseases and donate Spectacles.
![](https://i0.wp.com/hpi.lk/wp-content/uploads/2021/10/Health-Camp-14.jpg?fit=1040%2C584&ssl=1)
Similar Posts
![Batathota Project – 1.5 MW](https://i0.wp.com/hpi.lk/wp-content/uploads/2021/10/BA375A1.jpg?fit=400%2C297&ssl=1)
Batathota Project – 1.5 MW
Batathota Mini Hydro-power Project – 1.5 MW Batathota was completed by HPI in February 2007. The specialty of this project is HPI handled only the Electro Mechanical installations in Sri Lanka. The greatest challenge was to collaborate with different entities as there were many external parties involved with the project. Finally, we were able to…
![Yandohun Micro Hydro power Project – World Bank Funded Project in the Republic of Liberia](https://i0.wp.com/hpi.lk/wp-content/uploads/2021/10/Yandohun_DSC02247.jpg?fit=768%2C432&ssl=1)
Yandohun Micro Hydro power Project – World Bank Funded Project in the Republic of Liberia
Project Yandohun Micro Hydropower Project Client Rural and Renewable Energy Agency, Republic of Liberia Project Type Off-Grid Capacity 60 kW hydro project with HT/ LT distribution network Beneficiaries 120 Households Remarks This is the First Hydropower Project done after 14 Years of Civil War in Liberia and the plant was gifted for the needy people…
![Village Hydropower Projects – Sri Lanka](https://i0.wp.com/hpi.lk/wp-content/uploads/2020/10/4.3.1_Village-Hydro-Projects-Introduction-Picture.jpg?fit=406%2C530&ssl=1)
Village Hydropower Projects – Sri Lanka
Dr.Nishantha Nanayakkara being an academic at the Moratuwa University of Sri Lanka attached to the Electrical Department found the necessity of inputs to society soon after he came back to Sri Lanka in 1995 after finishing all his post-graduate studies. 1996/97 had been the worst era of the electricity sector in Sri Lanka with 10-15…