Conferment of a Computer Center for a Rural School “VIDULA COMPUTER CENTER” in collaboration with ENCO and DFCC Bank
Similar Posts
Gatubwe Project
ByadminGatubwe Mini Hydropower Project Client UNIDO Location Agatobe, Republic of Rwanda Capacity [kW] 200 Beneficiaries 350 Households Transmission Voltage 11 kV Distribution N/W 10km at 230V Channel Length 500 m Penstock Length 30 m Design Flow 1500 Litre/sec Gross Head 18 m Commissioned in July 2012
Mutubo Project
ByadminMutubo Mini Hydropower Project Client UNIDO Location Ruhangeri, Republic of Rwanda Capacity [kW] 200 Beneficiaries 350 Households Transmission Voltage 11 kV Distribution N/W 6km at 230V Channel Length 600 m Penstock Length 180 m Design Flow 90 Litre/sec Gross Head 120 m Commissioned in May 2010
Nyamyotsi Project – Stage I
ByadminNyamyotsi Mini Hydropower Project – Stage I Nyamyotsi hydropower project is located in the Rugera Sector on Nyadihu District in the Western Rwanda. Previously this province was called as the Ruhengeri Province. This project was identified by the team of UNIDO and local experts in the year 2004 and it was developed by UNIDIO, which…
Rupingazi Small Hydro Electric Power Project
ByadminClient Kenya Tea Development Agency Holdings Limited, Republic of Kenya Capacity 1.8 MW Location Embu County, Republic of Kenya Project Type EPC
Davora Tea (Private) Limited
ByadminDavora Tea was incorporated in 2015, aiming the local sales and exports of Ceylon Tea manufactured in our own Tea Factories. We have a strong bond with our respective Tea Brokers and we consult them as and when required, like when we need to go for perfect blends such as to maintain the quality and…
Wee Oya Project – 6 MW
ByadminWee Oya Mini Hydro-power Project – 6 MW Wee Oya is another successful mini hydro project developed by HPI for Power base Technology (Pvt) Ltd. and the second mini hydro plant developed by HPI with them. This clearly shows the confidence our clients have placed on us. The mother company of the Power base, Naturub…











