A Project on Solar Power Systems at RSL Ceramics Factory Premises, Homagama
| Capacity | 100.17 kW |
| Project Type | Supply, installation and Commissioning under Net Plus Scheme |
| Completion Year | 2017 |
| Solar Panel Provider& Technology Transfer | Alta Vision Solar |

A Project on Solar Power Systems at RSL Ceramics Factory Premises, Homagama
| Capacity | 100.17 kW |
| Project Type | Supply, installation and Commissioning under Net Plus Scheme |
| Completion Year | 2017 |
| Solar Panel Provider& Technology Transfer | Alta Vision Solar |



Davora Tea was incorporated in 2015, aiming the local sales and exports of Ceylon Tea manufactured in our own Tea Factories. We have a strong bond with our respective Tea Brokers and we consult them as and when required, like when we need to go for perfect blends such as to maintain the quality and…
RSL Ceramics (Pvt) Ltd.(Delux) Is the leading manufacturer of premium quality ceramic bath ware products for the Sri Lankan market. They offer a wide range of sanitaryware products for affordable prices. Whether you are looking for the latest innovations, traditional or modern designs, vibrant colors, or international standards, RSL Ceramics is committed to providing you…
Venue: Kataragama, Kiri Vehera Date: 12-Jan-2017
With the collaboration of “Terra People Association – Japan”, Hydro Power International has started awarding scholarships to 05 Students in Sanghamitta Girls’ College, Galle; each year since 1997. This was the period in which we started Operations of our Company. Those 05 students were selected from Grade 11 and we financially assisted them until they…
Construction at KalawaAragam 10MW Biomass Power Plant, Monaragala Client Green Watts (Private) Limited Period Year 2018 ~ 2019 Constructions Carried out Project Cost Chimney Foundation, Flue duct foundation, Heat pipe foundation, Duster platform, Reducer Foundation, Circular pump equipment foundation LKR 11,833,813.00 Canteen Building LKR 10,636,368.59 Retaining Wall construction LKR 5,063,241.95 Hydraulic House, Tilting…
Niriella Mini Hydropower Project – 3 MW Trailed by the success of the Kabaragala Mini Hydro Project, HPI was awarded to construct another Turnkey Project in Niriella by the Naturub Group of Companies. This project was commissioned in September 2002 with a total generating capacity of 3 MW. Power base Technology (Pvt) Ltd. is the…