Completely constructed the Access Road of “Sri Jayathilakarama Temple” of Metibemiya, Hanguranketha, and donated it to the Temple on 24/12/2017. This was the only road leading to the Temple which was in a poor state, prior to the road construction.
Similar Posts
Hydropower Projects in Rwanda – On the Invitation of MININFRA
ByadminObserving the success of UNIDO Projects handled by ENCO (Pvt) Ltd., the Ministry of Infrastructure of the Government of Rwanda (MININFRA) invited us to design and build 8 new grid connected and off grid hydropower schemes along Rwanda’s North-South Central Mountain Range, with a total generation capacity of 6.35 MW. Site Visit carried out by…
Kabaragala Project
ByadminKabaragala Mini Hydro-power Project – 2.25 MW Kabaragala Mini Hydro Power project is the maiden turnkey project handled by HPI which is located at the far end of Nuwaraeliya. HPI handled all electro-mechanical and civil works of the project from grass root level and successfully commissioned it in May 2001 with a total generating capacity…
Niriella Mini Hydropower Project – 3 MW
ByadminNiriella Mini Hydropower Project – 3 MW Trailed by the success of the Kabaragala Mini Hydro Project, HPI was awarded to construct another Turnkey Project in Niriella by the Naturub Group of Companies. This project was commissioned in September 2002 with a total generating capacity of 3 MW. Power base Technology (Pvt) Ltd. is the…
Davora Corporate Cricket Match
ByadminVenue: Galle Date: 22-Mar-2015
Transmission Line Project from Habarana to Veyangoda
ByadminConstruction of 220 kV Transmission Line Project from Habarana to Veyangoda
Maliboda Project – 1 MW
ByadminMaliboda Mini Hydro-power Project – 1 MW The proposed Maliboda Mini Hydro Power Project site utilizes the waters of Magal Ganga at Magala village in the Maliboda area in Deraniyagala Divisional secretariat Division in Kegalle District. The upper catchment boundary of the Magal Ganga extends up to an elevation of the app. 1,160 m MSL….