Mal Pooja
Venue: Matara Bodhiya Premises
Date: 05-Nov-2014
This event had been organized as a tribute to Late Mrs. Prema Nanayakkara, dearest Mother of the Founder of our Company, Dr. Nishantha Nanayakkara








This event had been organized as a tribute to Late Mrs. Prema Nanayakkara, dearest Mother of the Founder of our Company, Dr. Nishantha Nanayakkara







Nyamyotsi Mini Hydropower Project – Stage II Client UNIDO Location Nyadihu District, Republic of Rwanda Capacity [kW] 100 Beneficiaries 250 Households Transmission Voltage 400 V Distribution N/W 3km at 230V Channel Length 200 m Penstock Length 250 m Design Flow 90 Litre/sec Gross Head 120 m Commissioned in July 2012
Observing the success of UNIDO Projects handled by ENCO (Pvt) Ltd., the Ministry of Infrastructure of the Government of Rwanda (MININFRA) invited us to design and build 8 new grid connected and off grid hydropower schemes along Rwanda’s North-South Central Mountain Range, with a total generation capacity of 6.35 MW. Site Visit carried out by…
Upper Korawak Oya Mini Hydro-power Project – 1.5 MW Upper Korawak Oya hydro power project was developed by HPI for Santak Power (Pvt) Ltd. in Nawalapitiya. Project was successfully commissioned in January 2006 with the installed capacity of 1.5 MW. Upper Korawaka Oya is one of the five parallel projects handled between 2004-2005 by HPI….
Minister of Community Development of Burundi – Jean Baptiste Gahimbare and Director General of Water Supply & Energy for Rural Areas in Burundi – Ndayitwayeko Fulgence inspected several Mini Hydropower Projects in Deraniyagala and Nawalapitiyain July 2005, to assess the developments in the hydropower sector in Sri Lanka before they sign the Agreement with UNIDO….
Organize Health Campaigns annually as Social Welfare Projects in Remote Areas in Akuressa – Matara for Eye Testing & Identification of Non-Transferrable Diseases and donate Spectacles.
We again entered in acquiring distress factories from the banks and entered into tea manufacturing, since 2014 and went on acquiring five factories in down south and one in Ratnapura District, with an annual manufacturing capacity of 4000 Tons. This is a fairly big volume of tea, employing nearly 1000 workers and having more than…