Mal Pooja
Venue: Matara Bodhiya Premises
Date: 05-Nov-2014
This event had been organized as a tribute to Late Mrs. Prema Nanayakkara, dearest Mother of the Founder of our Company, Dr. Nishantha Nanayakkara
![](https://i1.wp.com/hpi.lk/wp-content/uploads/2021/11/Mal-Pooja_4-1024x768.jpg?ssl=1)
![](https://i2.wp.com/hpi.lk/wp-content/uploads/2021/11/Mal-Pooja_2-1024x768.jpg?ssl=1)
![](https://i1.wp.com/hpi.lk/wp-content/uploads/2021/11/Mal-Pooja_1-768x1024.jpg?ssl=1)
![](https://i2.wp.com/hpi.lk/wp-content/uploads/2021/11/Mal-Pooja_3-1024x768.jpg?ssl=1)
![](https://i2.wp.com/hpi.lk/wp-content/uploads/2021/11/Mal-Pooja_6-1024x768.jpg?ssl=1)
![](https://i0.wp.com/hpi.lk/wp-content/uploads/2021/11/Mal-Pooja_5-1024x768.jpg?ssl=1)
![](https://i0.wp.com/hpi.lk/wp-content/uploads/2021/11/Mal-Pooja_7-1024x768.jpg?ssl=1)
Construction at KalawaAragam 10MW Biomass Power Plant, Monaragala Client Green Watts (Private) Limited Period Year 2018 ~ 2019 Constructions Carried out Project Cost Chimney Foundation, Flue duct foundation, Heat pipe foundation, Duster platform, Reducer Foundation, Circular pump equipment foundation LKR 11,833,813.00 Canteen Building LKR 10,636,368.59 Retaining Wall construction LKR 5,063,241.95 Hydraulic House, Tilting…
Gatubwe Mini Hydropower Project Client UNIDO Location Agatobe, Republic of Rwanda Capacity [kW] 200 Beneficiaries 350 Households Transmission Voltage 11 kV Distribution N/W 10km at 230V Channel Length 500 m Penstock Length 30 m Design Flow 1500 Litre/sec Gross Head 18 m Commissioned in July 2012
We again entered in acquiring distress factories from the banks and entered into tea manufacturing, since 2014 and went on acquiring five factories in down south and one in Ratnapura District, with an annual manufacturing capacity of 4000 Tons. This is a fairly big volume of tea, employing nearly 1000 workers and having more than…