Soranethota Project – 1.4 MW

Soranethota Mini Hydro-power Project – 1.4 MW

Soranethota hydro power project was developed by HPI for Access Energy (Pvt) Ltd. in Badulla. Project was successfully commissioned in December 2008 with the installed capacity of 1.4 MW.

Similar Posts

  • | |

    Nyamyotsi Project – Stage I

    Nyamyotsi Mini Hydropower Project – Stage I Nyamyotsi hydropower project is located in the Rugera Sector on Nyadihu District in the Western Rwanda. Previously this province was called as the Ruhengeri Province. This project was identified by the team of UNIDO and local experts in the year 2004 and it was developed by UNIDIO, which…

  • | |

    Karawila Ganga Project

    Karawila Ganga Mini Hydro-power Project – 0.75 MW The project utilizes the waters of Karawila Ganga in the Kegalle District in Sri Lanka to generate 0.75 MW of Electricity. The project is owned by Kandureliya Hydro Power (Pvt) Ltd. The main investor for the project was General Sales Company which is an associate company of…

  • |

    Fukada Environment Solutions (Private) Limited

    Purpose; to introduce KUBOTA’s domestic sewerage treatment facility called Joukasou systems In the latter part of 2018, Fukada Environmental Development Industries Co., Ltd. (Japan), expressed interest in joining hands with us to introduce Japanese technology for sewerage/ kitchen water treatment facilities using KUBOTA’s technology which is the best in the world and affordable with good quality…

  • |

    Shishyodaya Foundation

    With the collaboration of “Terra People Association – Japan”, Hydro Power International has started awarding scholarships to 05 Students in Sanghamitta Girls’ College, Galle; each year since 1997. This was the period in which we started Operations of our Company. Those 05 students were selected from Grade 11 and we financially assisted them until they…

Leave a Reply