Conferment of a Computer Center for a Rural School “VIDULA COMPUTER CENTER” in collaboration with ENCO and DFCC Bank
Similar Posts
Kiruwana Oya Project
Kiruwana Oya Mini Hydro-power Project – 0.6 MW The project utilizes the waters of Kiruwana Oya in the Matara District in Sri Lanka to generate 0.6 MW of Electricity. The Project was developed by Nilwalabase Hydro Power (Pvt) Ltd., which was incorporated in 2004, mainly for developing grid-connected small power projects. The main investor of…
Batathota Project – 1.5 MW
Batathota Mini Hydro-power Project – 1.5 MW Batathota was completed by HPI in February 2007. The specialty of this project is HPI handled only the Electro Mechanical installations in Sri Lanka. The greatest challenge was to collaborate with different entities as there were many external parties involved with the project. Finally, we were able to…
Manelwala Project – 2.4 MW
Manelwala Mini Hydro-power Project – 2.4 MW Manelwala was completed by HPI in June 2008 as an EPC Contract. The main investor for the projects was Manelwala Hydro Power (Pvt)Ltd., which is same as Panasian Power (Pvt) Ltd. with joint investment with HPI and New Energy Ltd. in United Kingdom. Type of Contract Turn Key…
Davora Tea Factories
We again entered in acquiring distress factories from the banks and entered into tea manufacturing, since 2014 and went on acquiring five factories in down south and one in Ratnapura District, with an annual manufacturing capacity of 4000 Tons. This is a fairly big volume of tea, employing nearly 1000 workers and having more than…