Conferment of a Computer Center for a Rural School “VIDULA COMPUTER CENTER” in collaboration with ENCO and DFCC Bank
Similar Posts
Soranethota Project – 1.4 MW
ByadminSoranethota Mini Hydro-power Project – 1.4 MW Soranethota hydro power project was developed by HPI for Access Energy (Pvt) Ltd. in Badulla. Project was successfully commissioned in December 2008 with the installed capacity of 1.4 MW.
Fukada Environment Solutions (Private) Limited
ByadminPurpose; to introduce KUBOTA’s domestic sewerage treatment facility called Joukasou systems In the latter part of 2018, Fukada Environmental Development Industries Co., Ltd. (Japan), expressed interest in joining hands with us to introduce Japanese technology for sewerage/ kitchen water treatment facilities using KUBOTA’s technology which is the best in the world and affordable with good quality…
Gammaduwa(A Cultural Event)
ByadminAnnually organize this event by RSL Ceramics (Private) Limited, by wishing the blessings of Goddess Pattini on the Village and villagers for the continuity of happiness, safety, and harmony. This is a cultural event based on historical stories and people’s believes.
Manakola Project
ByadminManakola Mini Hydro-power Project – 2.5 MW This Project is an idea of Dr. Nanayakkara and his Engineering Team. This Power Plant is located in Hanguranketha DS Division in Nuwara Eliya District and the Water of Beliul Oya, which is a tributary of Mahaweli River, is used near Elamulla village in order to harness renewable…
Village Hydropower Projects – Sri Lanka
ByadminDr.Nishantha Nanayakkara being an academic at the Moratuwa University of Sri Lanka attached to the Electrical Department found the necessity of inputs to society soon after he came back to Sri Lanka in 1995 after finishing all his post-graduate studies. 1996/97 had been the worst era of the electricity sector in Sri Lanka with 10-15…
Blood Donation Campaigns
ByadminOrganize Blood Donation Campaigns annually and motivate the community for such involvements.