Batathota Project – 1.5 MW
Batathota Mini Hydro-power Project – 1.5 MW Batathota was completed by HPI in February 2007. The specialty of this project is HPI handled only the Electro Mechanical installations in Sri Lanka. The greatest challenge was to collaborate with different entities as there were many external parties involved with the project. Finally, we were able to…
Fukada Environment Solutions (Private) Limited
Purpose; to introduce KUBOTA’s domestic sewerage treatment facility called Joukasou systems In the latter part of 2018, Fukada Environmental Development Industries Co., Ltd. (Japan), expressed interest in joining hands with us to introduce Japanese technology for sewerage/ kitchen water treatment facilities using KUBOTA’s technology which is the best in the world and affordable with good quality…
Mutubo Project
Mutubo Mini Hydropower Project Client UNIDO Location Ruhangeri, Republic of Rwanda Capacity [kW] 200 Beneficiaries 350 Households Transmission Voltage 11 kV Distribution N/W 6km at 230V Channel Length 600 m Penstock Length 180 m Design Flow 90 Litre/sec Gross Head 120 m Commissioned in May 2010