Client | Kenya Tea Development Agency Holdings Limited, Republic of Kenya |
Capacity | 1.8 MW |
Location | Embu County, Republic of Kenya |
Project Type | EPC |

Similar Posts
Nyamyotsi Project – Stage II
ByadminNyamyotsi Mini Hydropower Project – Stage II Client UNIDO Location Nyadihu District, Republic of Rwanda Capacity [kW] 100 Beneficiaries 250 Households Transmission Voltage 400 V Distribution N/W 3km at 230V Channel Length 200 m Penstock Length 250 m Design Flow 90 Litre/sec Gross Head 120 m Commissioned in July 2012
Flower Offering Religious Event
ByadminMal Pooja Venue: Matara Bodhiya Premises Date: 05-Nov-2014 This event had been organized as a tribute to Late Mrs. Prema Nanayakkara, dearest Mother of the Founder of our Company, Dr. Nishantha Nanayakkara
Village Hydropower Projects – Sri Lanka
ByadminDr.Nishantha Nanayakkara being an academic at the Moratuwa University of Sri Lanka attached to the Electrical Department found the necessity of inputs to society soon after he came back to Sri Lanka in 1995 after finishing all his post-graduate studies. 1996/97 had been the worst era of the electricity sector in Sri Lanka with 10-15…
Nyamyotsi Project – Stage I
ByadminNyamyotsi Mini Hydropower Project – Stage I Nyamyotsi hydropower project is located in the Rugera Sector on Nyadihu District in the Western Rwanda. Previously this province was called as the Ruhengeri Province. This project was identified by the team of UNIDO and local experts in the year 2004 and it was developed by UNIDIO, which…
Transmission Line Project from Habarana to Veyangoda
ByadminConstruction of 220 kV Transmission Line Project from Habarana to Veyangoda
Social Projects in the Republic of Kenya
ByadminConduct skill development and self-motivation programs for villagers in rural areas.