| Client | Kenya Tea Development Agency Holdings Limited, Republic of Kenya |
| Capacity | 1.8 MW |
| Location | Embu County, Republic of Kenya |
| Project Type | EPC |
Similar Posts
Flower Offering Religious Event
ByadminMal Pooja Venue: Matara Bodhiya Premises Date: 05-Nov-2014 This event had been organized as a tribute to Late Mrs. Prema Nanayakkara, dearest Mother of the Founder of our Company, Dr. Nishantha Nanayakkara
Maliboda Project – 1 MW
ByadminMaliboda Mini Hydro-power Project – 1 MW The proposed Maliboda Mini Hydro Power Project site utilizes the waters of Magal Ganga at Magala village in the Maliboda area in Deraniyagala Divisional secretariat Division in Kegalle District. The upper catchment boundary of the Magal Ganga extends up to an elevation of the app. 1,160 m MSL….
Monastery for Buddhist Monks
ByadminBuild Chambers in Kalawana Area, a really calming place boarded to Sinharaja Forest and offered to Meditative Buddhist Monks in November 2017.
Davora Corporate Cricket Match
ByadminVenue: Galle Date: 22-Mar-2015
Nyamyotsi Project – Stage II
ByadminNyamyotsi Mini Hydropower Project – Stage II Client UNIDO Location Nyadihu District, Republic of Rwanda Capacity [kW] 100 Beneficiaries 250 Households Transmission Voltage 400 V Distribution N/W 3km at 230V Channel Length 200 m Penstock Length 250 m Design Flow 90 Litre/sec Gross Head 120 m Commissioned in July 2012
Upper Korawak Oya Project – 1.5 MW
ByadminUpper Korawak Oya Mini Hydro-power Project – 1.5 MW Upper Korawak Oya hydro power project was developed by HPI for Santak Power (Pvt) Ltd. in Nawalapitiya. Project was successfully commissioned in January 2006 with the installed capacity of 1.5 MW. Upper Korawaka Oya is one of the five parallel projects handled between 2004-2005 by HPI….







