Client | ZE Energy Inc., Japan |
Location | Toyama Prefecture |
Sites | 1. Nimangoko Irrigation Scheme 2. Kobutamata River 3. Yamada River 4. Itadoni River 5. Mitani Rivers 6. Gyadani River 7. Wakatsuchi River |
Commissioned In | November 2014 |
Similar Posts
ENCO (Private) Limited
We set up our first company ENCO, to qualify for ESD Project and engaged in Off-Grid village hydro project development as a developer. Social mobilization, get village folks to team up to work for a dream of their own village hydro project, preservation of forest cover in the catchment area, and more interestingly how to…
Davora Capital (Private) Limited
The isle of Sri Lanka is bountiful geography, blessed with many springs, rivers, and waterfalls that are nourished by the showers that pour throughout the year. As a pioneer in Renewable Energy Development, we have made use of our gifts from Mother Nature and transformed them into Hydropower Plants. Davora Capital Group has been in…
Maliboda Project – 1 MW
Maliboda Mini Hydro-power Project – 1 MW The proposed Maliboda Mini Hydro Power Project site utilizes the waters of Magal Ganga at Magala village in the Maliboda area in Deraniyagala Divisional secretariat Division in Kegalle District. The upper catchment boundary of the Magal Ganga extends up to an elevation of the app. 1,160 m MSL….
Shishyodaya Foundation
With the collaboration of “Terra People Association – Japan”, Hydro Power International has started awarding scholarships to 05 Students in Sanghamitta Girls’ College, Galle; each year since 1997. This was the period in which we started Operations of our Company. Those 05 students were selected from Grade 11 and we financially assisted them until they…