A Project on Solar Power Systems at Veddagala Factory Premises, Kalawana.
Capacity | 101.25 kW |
Project Type | Supply. installation and Commissioning under Net Plus Scheme |
Completion Year | 2018 |
Solar Panel Provider & Technology Transfer | Alta Vision Solar |
A Project on Solar Power Systems at Veddagala Factory Premises, Kalawana.
Capacity | 101.25 kW |
Project Type | Supply. installation and Commissioning under Net Plus Scheme |
Completion Year | 2018 |
Solar Panel Provider & Technology Transfer | Alta Vision Solar |
Venue: Galle Date: 22-Mar-2015
The feasibility study of Guinea Project was completed successfully and handed over by ENCO (Pvt) Ltd. This is also a project funded by UNIDO. The proposed dam of the Hydro Power plant across Makona River is situated close to the village called “Keno” in the city called Gueckedou. The Makona River finally falls into the…
Manakola Mini Hydro-power Project – 2.5 MW This Project is an idea of Dr. Nanayakkara and his Engineering Team. This Power Plant is located in Hanguranketha DS Division in Nuwara Eliya District and the Water of Beliul Oya, which is a tributary of Mahaweli River, is used near Elamulla village in order to harness renewable…
Completely constructed the Access Road of “Sri Jayathilakarama Temple” of Metibemiya, Hanguranketha, and donated it to the Temple on 24/12/2017. This was the only road leading to the Temple which was in a poor state, prior to the road construction.
Maliboda Mini Hydro-power Project – 1 MW The proposed Maliboda Mini Hydro Power Project site utilizes the waters of Magal Ganga at Magala village in the Maliboda area in Deraniyagala Divisional secretariat Division in Kegalle District. The upper catchment boundary of the Magal Ganga extends up to an elevation of the app. 1,160 m MSL….
Mutubo Mini Hydropower Project Client UNIDO Location Ruhangeri, Republic of Rwanda Capacity [kW] 200 Beneficiaries 350 Households Transmission Voltage 11 kV Distribution N/W 6km at 230V Channel Length 600 m Penstock Length 180 m Design Flow 90 Litre/sec Gross Head 120 m Commissioned in May 2010