A Project on Solar Power Systems at Veddagala Factory Premises, Kalawana.
| Capacity | 101.25 kW |
| Project Type | Supply. installation and Commissioning under Net Plus Scheme |
| Completion Year | 2018 |
| Solar Panel Provider & Technology Transfer | Alta Vision Solar |

A Project on Solar Power Systems at Veddagala Factory Premises, Kalawana.
| Capacity | 101.25 kW |
| Project Type | Supply. installation and Commissioning under Net Plus Scheme |
| Completion Year | 2018 |
| Solar Panel Provider & Technology Transfer | Alta Vision Solar |




With the collaboration of “Terra People Association – Japan”, Hydro Power International has started awarding scholarships to 05 Students in Sanghamitta Girls’ College, Galle; each year since 1997. This was the period in which we started Operations of our Company. Those 05 students were selected from Grade 11 and we financially assisted them until they…
Gatubwe Mini Hydropower Project Client UNIDO Location Agatobe, Republic of Rwanda Capacity [kW] 200 Beneficiaries 350 Households Transmission Voltage 11 kV Distribution N/W 10km at 230V Channel Length 500 m Penstock Length 30 m Design Flow 1500 Litre/sec Gross Head 18 m Commissioned in July 2012
We again entered in acquiring distress factories from the banks and entered into tea manufacturing, since 2014 and went on acquiring five factories in down south and one in Ratnapura District, with an annual manufacturing capacity of 4000 Tons. This is a fairly big volume of tea, employing nearly 1000 workers and having more than…
Build Chambers in Kalawana Area, a really calming place boarded to Sinharaja Forest and offered to Meditative Buddhist Monks in November 2017.
Kiruwana Oya Mini Hydro-power Project – 0.6 MW The project utilizes the waters of Kiruwana Oya in the Matara District in Sri Lanka to generate 0.6 MW of Electricity. The Project was developed by Nilwalabase Hydro Power (Pvt) Ltd., which was incorporated in 2004, mainly for developing grid-connected small power projects. The main investor of…
Manakola Mini Hydro-power Project – 2.5 MW This Project is an idea of Dr. Nanayakkara and his Engineering Team. This Power Plant is located in Hanguranketha DS Division in Nuwara Eliya District and the Water of Beliul Oya, which is a tributary of Mahaweli River, is used near Elamulla village in order to harness renewable…