| Client | Kenya Tea Development Agency Limited, Republic of Kenya |
| Capacity | 1.5 MW |
| Location | Meru County, Republic of Kenya |
| Project Type | EPC/Turnkey |
Similar Posts
Nyamyotsi Project – Stage II
ByadminNyamyotsi Mini Hydropower Project – Stage II Client UNIDO Location Nyadihu District, Republic of Rwanda Capacity [kW] 100 Beneficiaries 250 Households Transmission Voltage 400 V Distribution N/W 3km at 230V Channel Length 200 m Penstock Length 250 m Design Flow 90 Litre/sec Gross Head 120 m Commissioned in July 2012
Mutubo Project
ByadminMutubo Mini Hydropower Project Client UNIDO Location Ruhangeri, Republic of Rwanda Capacity [kW] 200 Beneficiaries 350 Households Transmission Voltage 11 kV Distribution N/W 6km at 230V Channel Length 600 m Penstock Length 180 m Design Flow 90 Litre/sec Gross Head 120 m Commissioned in May 2010
Kaiha 2 Small Hydro-power Plant
ByadminClient Rural and Renewable Energy Agency, Republic of Liberia Capacity 2.5 MW Location Lofa County, Republic of Liberia Project Type Supply & Installation Remarks The contract is awarded to the JV of ENCO, HPI & FUSO
Feasibility Study in Guinea
ByadminThe feasibility study of Guinea Project was completed successfully and handed over by ENCO (Pvt) Ltd. This is also a project funded by UNIDO. The proposed dam of the Hydro Power plant across Makona River is situated close to the village called “Keno” in the city called Gueckedou. The Makona River finally falls into the…
Kabaragala Project
ByadminKabaragala Mini Hydro-power Project – 2.25 MW Kabaragala Mini Hydro Power project is the maiden turnkey project handled by HPI which is located at the far end of Nuwaraeliya. HPI handled all electro-mechanical and civil works of the project from grass root level and successfully commissioned it in May 2001 with a total generating capacity…
Batathota Project – 1.5 MW
ByadminBatathota Mini Hydro-power Project – 1.5 MW Batathota was completed by HPI in February 2007. The specialty of this project is HPI handled only the Electro Mechanical installations in Sri Lanka. The greatest challenge was to collaborate with different entities as there were many external parties involved with the project. Finally, we were able to…


















