By expanding the wings of HPI, now we are into the sales of Value Added Tea which is manufactured in our own Tea Factories. We intend to send samples to Japan, Australia, China, Liberia & Pakistan and waiting to start over our business locally as well as internationally.
Similar Posts
Nyamyotsi Project – Stage II
ByadminNyamyotsi Mini Hydropower Project – Stage II Client UNIDO Location Nyadihu District, Republic of Rwanda Capacity [kW] 100 Beneficiaries 250 Households Transmission Voltage 400 V Distribution N/W 3km at 230V Channel Length 200 m Penstock Length 250 m Design Flow 90 Litre/sec Gross Head 120 m Commissioned in July 2012
Davora Capital (Private) Limited
ByadminThe isle of Sri Lanka is bountiful geography, blessed with many springs, rivers, and waterfalls that are nourished by the showers that pour throughout the year. As a pioneer in Renewable Energy Development, we have made use of our gifts from Mother Nature and transformed them into Hydropower Plants. Davora Capital Group has been in…
Flower Offering Religious Event
ByadminMal Pooja Venue: Matara Bodhiya Premises Date: 05-Nov-2014 This event had been organized as a tribute to Late Mrs. Prema Nanayakkara, dearest Mother of the Founder of our Company, Dr. Nishantha Nanayakkara
Niriella Mini Hydropower Project – 3 MW
ByadminNiriella Mini Hydropower Project – 3 MW Trailed by the success of the Kabaragala Mini Hydro Project, HPI was awarded to construct another Turnkey Project in Niriella by the Naturub Group of Companies. This project was commissioned in September 2002 with a total generating capacity of 3 MW. Power base Technology (Pvt) Ltd. is the…
Mutubo Project
ByadminMutubo Mini Hydropower Project Client UNIDO Location Ruhangeri, Republic of Rwanda Capacity [kW] 200 Beneficiaries 350 Households Transmission Voltage 11 kV Distribution N/W 6km at 230V Channel Length 600 m Penstock Length 180 m Design Flow 90 Litre/sec Gross Head 120 m Commissioned in May 2010
Nyamenga Mini Hydropower Plant – Burundi
ByadminWe could win another competitive contract to upgrade the Nyamenga hydropower plant in the neighbouring nation of Burundi, from an existing capacity of 1.4 MW to 2.8 MW with two additional turbine-generator sets. This plant augmentation was successfully completed and commissioned in June 2009.









