Construction of 220 kV Transmission Line Project from Habarana to Veyangoda

Similar Posts

Scoping & Feasibility Studies in the Republic of Liberia
Client Ministry of Lands, Mines, and Energy, Republic of Liberia Sites 1. Jor River at Gbatala, Bong County 2. Du River at Kakata, Margibi County 3. Cestors River between Grand bassa and Sinoe Counties 4. St. John River at Gbedin, Nimba County 5. Dugbe River in River Gee County 6. Wozi Creek in Zorzor,…

Davora Tea Factories
We again entered in acquiring distress factories from the banks and entered into tea manufacturing, since 2014 and went on acquiring five factories in down south and one in Ratnapura District, with an annual manufacturing capacity of 4000 Tons. This is a fairly big volume of tea, employing nearly 1000 workers and having more than…

Davora Corporate Cricket Match
Venue: Galle Date: 22-Mar-2015

Renovation of Sri Wivekaramaya Temple, Manakola
Provided financial assistance for the renovation of “Sri Wivekaramaya Temple” of MaditthaKumbura, Manakola and completely handled fixing electric lamps around the Temple area in the year 2019 & continuously monitor the electrical issues.

Pre-feasibility Studies on Hydropower potential in Japan
Client ZE Energy Inc., Japan Location Toyama Prefecture Sites 1. Nimangoko Irrigation Scheme 2. Kobutamata River 3. Yamada River 4. Itadoni River 5. Mitani Rivers 6. Gyadani River 7. Wakatsuchi River Commissioned In November 2014

Gatubwe Project
Gatubwe Mini Hydropower Project Client UNIDO Location Agatobe, Republic of Rwanda Capacity [kW] 200 Beneficiaries 350 Households Transmission Voltage 11 kV Distribution N/W 10km at 230V Channel Length 500 m Penstock Length 30 m Design Flow 1500 Litre/sec Gross Head 18 m Commissioned in July 2012