By expanding the wings of HPI, now we are into the sales of Value Added Tea which is manufactured in our own Tea Factories. We intend to send samples to Japan, Australia, China, Liberia & Pakistan and waiting to start over our business locally as well as internationally.
Similar Posts
Factory Expansion
ByadminFactory Expansion of RSL Ceramics Due to the high demand for our ceramics bath ware products, we are now in the process of expanding our Factory with modern European technological aspects. This is a project worth LKR 100 Mn. which is handling by Hydro Power International (Private) Limited. Constructions are going on in a 01…
Health Campaigns
ByadminOrganize Health Campaigns annually as Social Welfare Projects in Remote Areas in Akuressa – Matara for Eye Testing & Identification of Non-Transferrable Diseases and donate Spectacles.
Rupingazi Small Hydro Electric Power Project
ByadminClient Kenya Tea Development Agency Holdings Limited, Republic of Kenya Capacity 1.8 MW Location Embu County, Republic of Kenya Project Type EPC
Feasibility Study in Guinea
ByadminThe feasibility study of Guinea Project was completed successfully and handed over by ENCO (Pvt) Ltd. This is also a project funded by UNIDO. The proposed dam of the Hydro Power plant across Makona River is situated close to the village called “Keno” in the city called Gueckedou. The Makona River finally falls into the…
Davora Tea Factories
ByadminWe again entered in acquiring distress factories from the banks and entered into tea manufacturing, since 2014 and went on acquiring five factories in down south and one in Ratnapura District, with an annual manufacturing capacity of 4000 Tons. This is a fairly big volume of tea, employing nearly 1000 workers and having more than…
Nyamyotsi Project – Stage II
ByadminNyamyotsi Mini Hydropower Project – Stage II Client UNIDO Location Nyadihu District, Republic of Rwanda Capacity [kW] 100 Beneficiaries 250 Households Transmission Voltage 400 V Distribution N/W 3km at 230V Channel Length 200 m Penstock Length 250 m Design Flow 90 Litre/sec Gross Head 120 m Commissioned in July 2012









