Mutubo Project
ByadminMutubo Mini Hydropower Project Client UNIDO Location Ruhangeri, Republic of Rwanda Capacity [kW] 200 Beneficiaries 350 Households Transmission Voltage 11 kV Distribution N/W 6km at 230V Channel Length 600 m Penstock Length 180 m Design Flow 90 Litre/sec Gross Head 120 m Commissioned in May 2010
Scoping & Feasibility Studies in the Republic of Liberia
ByadminClient Ministry of Lands, Mines, and Energy, Republic of Liberia Sites 1. Jor River at Gbatala, Bong County 2. Du River at Kakata, Margibi County 3. Cestors River between Grand bassa and Sinoe Counties 4. St. John River at Gbedin, Nimba County 5. Dugbe River in River Gee County 6. Wozi Creek in Zorzor,…
Upper Korawak Oya Project – 1.5 MW
ByadminUpper Korawak Oya Mini Hydro-power Project – 1.5 MW Upper Korawak Oya hydro power project was developed by HPI for Santak Power (Pvt) Ltd. in Nawalapitiya. Project was successfully commissioned in January 2006 with the installed capacity of 1.5 MW. Upper Korawaka Oya is one of the five parallel projects handled between 2004-2005 by HPI….
KalawaAragam 10MW Biomass Power Plant
ByadminConstruction at KalawaAragam 10MW Biomass Power Plant, Monaragala Client Green Watts (Private) Limited Period Year 2018 ~ 2019 Constructions Carried out Project Cost Chimney Foundation, Flue duct foundation, Heat pipe foundation, Duster platform, Reducer Foundation, Circular pump equipment foundation LKR 11,833,813.00 Canteen Building LKR 10,636,368.59 Retaining Wall construction LKR 5,063,241.95 Hydraulic House, Tilting…
Kaiha 2 Small Hydro-power Plant
ByadminClient Rural and Renewable Energy Agency, Republic of Liberia Capacity 2.5 MW Location Lofa County, Republic of Liberia Project Type Supply & Installation Remarks The contract is awarded to the JV of ENCO, HPI & FUSO
Soranethota Project – 1.4 MW
ByadminSoranethota Mini Hydro-power Project – 1.4 MW Soranethota hydro power project was developed by HPI for Access Energy (Pvt) Ltd. in Badulla. Project was successfully commissioned in December 2008 with the installed capacity of 1.4 MW.