    Mutubo Project

    Mutubo Mini Hydropower Project Client UNIDO Location Ruhangeri, Republic of Rwanda Capacity [kW] 200 Beneficiaries 350 Households Transmission Voltage 11 kV Distribution N/W 6km at 230V Channel Length 600 m Penstock Length 180 m Design Flow 90 Litre/sec Gross Head 120 m Commissioned in May 2010

  • |

    Shishyodaya Foundation

    With the collaboration of “Terra People Association – Japan”, Hydro Power International has started awarding scholarships to 05 Students in Sanghamitta Girls’ College, Galle; each year since 1997. This was the period in which we started Operations of our Company. Those 05 students were selected from Grade 11 and we financially assisted them until they…

  • | |

    KalawaAragam 10MW Biomass Power Plant

    Construction at KalawaAragam 10MW Biomass Power Plant, Monaragala Client Green Watts (Private) Limited Period Year 2018 ~ 2019     Constructions Carried out Project Cost Chimney Foundation, Flue duct foundation, Heat pipe foundation, Duster platform, Reducer Foundation, Circular pump equipment foundation LKR 11,833,813.00 Canteen Building LKR 10,636,368.59 Retaining Wall construction LKR 5,063,241.95 Hydraulic House, Tilting…