Conduct skill development and self-motivation programs for villagers in rural areas.
![](https://i0.wp.com/hpi.lk/wp-content/uploads/2021/11/Kenya-20160522_125940.jpg?fit=2064%2C1161&ssl=1)
Similar Posts
![Factory Expansion](https://i0.wp.com/hpi.lk/wp-content/uploads/2021/10/RSLFAC3.jpg?fit=768%2C576&ssl=1)
Factory Expansion
Factory Expansion of RSL Ceramics Due to the high demand for our ceramics bath ware products, we are now in the process of expanding our Factory with modern European technological aspects. This is a project worth LKR 100 Mn. which is handling by Hydro Power International (Private) Limited. Constructions are going on in a 01…
![Upper Korawak Oya Project – 1.5 MW](https://i0.wp.com/hpi.lk/wp-content/uploads/2021/10/UPEC5E1.jpg?fit=768%2C576&ssl=1)
Upper Korawak Oya Project – 1.5 MW
Upper Korawak Oya Mini Hydro-power Project – 1.5 MW Upper Korawak Oya hydro power project was developed by HPI for Santak Power (Pvt) Ltd. in Nawalapitiya. Project was successfully commissioned in January 2006 with the installed capacity of 1.5 MW. Upper Korawaka Oya is one of the five parallel projects handled between 2004-2005 by HPI….
![Shishyodaya Foundation](https://i0.wp.com/hpi.lk/wp-content/uploads/2015/10/7.1.1_Shishyodaya-Foundation-Logo.png?fit=439%2C496&ssl=1)
Shishyodaya Foundation
With the collaboration of “Terra People Association – Japan”, Hydro Power International has started awarding scholarships to 05 Students in Sanghamitta Girls’ College, Galle; each year since 1997. This was the period in which we started Operations of our Company. Those 05 students were selected from Grade 11 and we financially assisted them until they…
![Nyamyotsi Project – Stage I](https://i0.wp.com/hpi.lk/wp-content/uploads/2021/10/Nyamyotsi-I_3-Nov-visit-173.jpg?fit=768%2C576&ssl=1)
Nyamyotsi Project – Stage I
Nyamyotsi Mini Hydropower Project – Stage I Nyamyotsi hydropower project is located in the Rugera Sector on Nyadihu District in the Western Rwanda. Previously this province was called as the Ruhengeri Province. This project was identified by the team of UNIDO and local experts in the year 2004 and it was developed by UNIDIO, which…
![Kiruwana Oya Project](https://i0.wp.com/hpi.lk/wp-content/uploads/2021/10/Kiruwana-Oya_Signing-SPPA_Jul-2020_1.jpg?fit=768%2C576&ssl=1)
Kiruwana Oya Project
Kiruwana Oya Mini Hydro-power Project – 0.6 MW The project utilizes the waters of Kiruwana Oya in the Matara District in Sri Lanka to generate 0.6 MW of Electricity. The Project was developed by Nilwalabase Hydro Power (Pvt) Ltd., which was incorporated in 2004, mainly for developing grid-connected small power projects. The main investor of…