ENCO (Private) Limited
We set up our first company ENCO, to qualify for ESD Project and engaged in Off-Grid village hydro project development as a developer. Social mobilization, get village folks to team up to work for a dream of their own village hydro project, preservation of forest cover in the catchment area, and more interestingly how to…

Village Hydropower Projects – Sri Lanka
Dr.Nishantha Nanayakkara being an academic at the Moratuwa University of Sri Lanka attached to the Electrical Department found the necessity of inputs to society soon after he came back to Sri Lanka in 1995 after finishing all his post-graduate studies. 1996/97 had been the worst era of the electricity sector in Sri Lanka with 10-15…

Hydropower Projects in Rwanda – On the Invitation of MININFRA
Observing the success of UNIDO Projects handled by ENCO (Pvt) Ltd., the Ministry of Infrastructure of the Government of Rwanda (MININFRA) invited us to design and build 8 new grid connected and off grid hydropower schemes along Rwanda’s North-South Central Mountain Range, with a total generation capacity of 6.35 MW. Site Visit carried out by…

Feasibility Study in Guinea
The feasibility study of Guinea Project was completed successfully and handed over by ENCO (Pvt) Ltd. This is also a project funded by UNIDO. The proposed dam of the Hydro Power plant across Makona River is situated close to the village called “Keno” in the city called Gueckedou. The Makona River finally falls into the…

Gatubwe Project
Gatubwe Mini Hydropower Project Client UNIDO Location Agatobe, Republic of Rwanda Capacity [kW] 200 Beneficiaries 350 Households Transmission Voltage 11 kV Distribution N/W 10km at 230V Channel Length 500 m Penstock Length 30 m Design Flow 1500 Litre/sec Gross Head 18 m Commissioned in July 2012

Niriella Mini Hydropower Project – 3 MW
Niriella Mini Hydropower Project – 3 MW Trailed by the success of the Kabaragala Mini Hydro Project, HPI was awarded to construct another Turnkey Project in Niriella by the Naturub Group of Companies. This project was commissioned in September 2002 with a total generating capacity of 3 MW. Power base Technology (Pvt) Ltd. is the…