Venue: Kataragama, Kiri Vehera
Date: 12-Jan-2017





























Representatives of “Terra People’s Association of Japan”, Ms. Ruri Okubo, Mr. Yamaji Kenzo, and 02 respectable donors including Mr. KasuoShingae visited Sri Lanka in March ’2016 to meet the scholarship holders of Shishyodaya Foundation. This event was successfully held with the participation of the…Principal of Sanghamitta College, Galle – Mrs. ChandaniUdakumbura, Teachers-In-Charge – Mrs. Chandima…
Dr.Nishantha Nanayakkara being an academic at the Moratuwa University of Sri Lanka attached to the Electrical Department found the necessity of inputs to society soon after he came back to Sri Lanka in 1995 after finishing all his post-graduate studies. 1996/97 had been the worst era of the electricity sector in Sri Lanka with 10-15…
Venue: Kataragama, Kiri Vehera Date: 12-Jan-2017
Construction of 220 kV Transmission Line Project from Habarana to Veyangoda
Kiruwana Oya Mini Hydro-power Project – 0.6 MW The project utilizes the waters of Kiruwana Oya in the Matara District in Sri Lanka to generate 0.6 MW of Electricity. The Project was developed by Nilwalabase Hydro Power (Pvt) Ltd., which was incorporated in 2004, mainly for developing grid-connected small power projects. The main investor of…
Mutubo Mini Hydropower Project Client UNIDO Location Ruhangeri, Republic of Rwanda Capacity [kW] 200 Beneficiaries 350 Households Transmission Voltage 11 kV Distribution N/W 6km at 230V Channel Length 600 m Penstock Length 180 m Design Flow 90 Litre/sec Gross Head 120 m Commissioned in May 2010