Venue: Kataragama, Kiri Vehera
Date: 12-Jan-2017





























Client ZE Energy Inc., Japan Location Toyama Prefecture Sites 1. Nimangoko Irrigation Scheme 2. Kobutamata River 3. Yamada River 4. Itadoni River 5. Mitani Rivers 6. Gyadani River 7. Wakatsuchi River Commissioned In November 2014
Soranethota Mini Hydro-power Project – 1.4 MW Soranethota hydro power project was developed by HPI for Access Energy (Pvt) Ltd. in Badulla. Project was successfully commissioned in December 2008 with the installed capacity of 1.4 MW.
Observing the success of UNIDO Projects handled by ENCO (Pvt) Ltd., the Ministry of Infrastructure of the Government of Rwanda (MININFRA) invited us to design and build 8 new grid connected and off grid hydropower schemes along Rwanda’s North-South Central Mountain Range, with a total generation capacity of 6.35 MW. Site Visit carried out by…
Conferment of a Computer Center for a Rural School “VIDULA COMPUTER CENTER” in collaboration with ENCO and DFCC Bank
Kabaragala Mini Hydro-power Project – 2.25 MW Kabaragala Mini Hydro Power project is the maiden turnkey project handled by HPI which is located at the far end of Nuwaraeliya. HPI handled all electro-mechanical and civil works of the project from grass root level and successfully commissioned it in May 2001 with a total generating capacity…
Construction at KalawaAragam 10MW Biomass Power Plant, Monaragala Client Green Watts (Private) Limited Period Year 2018 ~ 2019 Constructions Carried out Project Cost Chimney Foundation, Flue duct foundation, Heat pipe foundation, Duster platform, Reducer Foundation, Circular pump equipment foundation LKR 11,833,813.00 Canteen Building LKR 10,636,368.59 Retaining Wall construction LKR 5,063,241.95 Hydraulic House, Tilting…