| Client | ZE Energy Inc., Japan |
| Location | Toyama Prefecture |
| Sites | 1. Nimangoko Irrigation Scheme 2. Kobutamata River 3. Yamada River 4. Itadoni River 5. Mitani Rivers 6. Gyadani River 7. Wakatsuchi River |
| Commissioned In | November 2014 |





| Client | ZE Energy Inc., Japan |
| Location | Toyama Prefecture |
| Sites | 1. Nimangoko Irrigation Scheme 2. Kobutamata River 3. Yamada River 4. Itadoni River 5. Mitani Rivers 6. Gyadani River 7. Wakatsuchi River |
| Commissioned In | November 2014 |



Annually organize this event by RSL Ceramics (Private) Limited, by wishing the blessings of Goddess Pattini on the Village and villagers for the continuity of happiness, safety, and harmony. This is a cultural event based on historical stories and people’s believes.
Representatives of “Terra People’s Association of Japan”, Ms. Ruri Okubo, Mr. Yamaji Kenzo, and 02 respectable donors including Mr. KasuoShingae visited Sri Lanka in March ’2016 to meet the scholarship holders of Shishyodaya Foundation. This event was successfully held with the participation of the…Principal of Sanghamitta College, Galle – Mrs. ChandaniUdakumbura, Teachers-In-Charge – Mrs. Chandima…
Dr.Nishantha Nanayakkara being an academic at the Moratuwa University of Sri Lanka attached to the Electrical Department found the necessity of inputs to society soon after he came back to Sri Lanka in 1995 after finishing all his post-graduate studies. 1996/97 had been the worst era of the electricity sector in Sri Lanka with 10-15…
Project Yandohun Micro Hydropower Project Client Rural and Renewable Energy Agency, Republic of Liberia Project Type Off-Grid Capacity 60 kW hydro project with HT/ LT distribution network Beneficiaries 120 Households Remarks This is the First Hydropower Project done after 14 Years of Civil War in Liberia and the plant was gifted for the needy people…
With the collaboration of “Terra People Association – Japan”, Hydro Power International has started awarding scholarships to 05 Students in Sanghamitta Girls’ College, Galle; each year since 1997. This was the period in which we started Operations of our Company. Those 05 students were selected from Grade 11 and we financially assisted them until they…
Rath Ganga Mini Hydropower Project – 2 MW Rath Gaga mini-hydro project with the capacity of 2 MW is a successful project completed by HPI in 2004 August. The significance of this project is that the main investors were from the UK. Overseas partners invested via a newly incorporated offshore company, New Energy Limited. This…