Nyamenga Mini Hydropower Plant – Burundi

We could win another competitive contract to upgrade the Nyamenga hydropower plant in the neighbouring nation of Burundi, from an existing capacity of 1.4 MW to 2.8 MW with two additional turbine-generator sets.

This plant augmentation was successfully completed and commissioned in June 2009.

Similar Posts

  • | |

    Gatubwe Project

    Gatubwe Mini Hydropower Project Client UNIDO Location Agatobe, Republic of Rwanda Capacity [kW] 200 Beneficiaries 350 Households Transmission Voltage 11 kV Distribution N/W 10km at 230V Channel Length 500 m Penstock Length 30 m Design Flow 1500 Litre/sec Gross Head 18 m Commissioned in July 2012

  • TPA Representatives Visit in Sri Lanka in 2016

    Representatives of “Terra People’s Association of Japan”, Ms. Ruri Okubo, Mr. Yamaji Kenzo, and 02 respectable donors including Mr. KasuoShingae visited Sri Lanka in March ’2016 to meet the scholarship holders of Shishyodaya Foundation. This event was successfully held with the participation of the…Principal of Sanghamitta College, Galle – Mrs. ChandaniUdakumbura, Teachers-In-Charge – Mrs. Chandima…

Leave a Reply