| Client | Rural and Renewable Energy Agency, Republic of Liberia |
| Capacity | 2.5 MW |
| Location | Lofa County, Republic of Liberia |
| Project Type | Supply & Installation |
| Remarks | The contract is awarded to the JV of ENCO, HPI & FUSO |
Similar Posts
Karawila Ganga Project
ByadminKarawila Ganga Mini Hydro-power Project – 0.75 MW The project utilizes the waters of Karawila Ganga in the Kegalle District in Sri Lanka to generate 0.75 MW of Electricity. The project is owned by Kandureliya Hydro Power (Pvt) Ltd. The main investor for the project was General Sales Company which is an associate company of…
Feasibility Study in Guinea
ByadminThe feasibility study of Guinea Project was completed successfully and handed over by ENCO (Pvt) Ltd. This is also a project funded by UNIDO. The proposed dam of the Hydro Power plant across Makona River is situated close to the village called “Keno” in the city called Gueckedou. The Makona River finally falls into the…
Iraru Small Hydro Electric Power Project
ByadminClient Kenya Tea Development Agency Limited, Republic of Kenya Capacity 1.5 MW Location Meru County, Republic of Kenya Project Type EPC/Turnkey
Batathota Project – 1.5 MW
ByadminBatathota Mini Hydro-power Project – 1.5 MW Batathota was completed by HPI in February 2007. The specialty of this project is HPI handled only the Electro Mechanical installations in Sri Lanka. The greatest challenge was to collaborate with different entities as there were many external parties involved with the project. Finally, we were able to…
Rupingazi Small Hydro Electric Power Project
ByadminClient Kenya Tea Development Agency Holdings Limited, Republic of Kenya Capacity 1.8 MW Location Embu County, Republic of Kenya Project Type EPC
KalawaAragam 10MW Biomass Power Plant
ByadminConstruction at KalawaAragam 10MW Biomass Power Plant, Monaragala Client Green Watts (Private) Limited Period Year 2018 ~ 2019 Constructions Carried out Project Cost Chimney Foundation, Flue duct foundation, Heat pipe foundation, Duster platform, Reducer Foundation, Circular pump equipment foundation LKR 11,833,813.00 Canteen Building LKR 10,636,368.59 Retaining Wall construction LKR 5,063,241.95 Hydraulic House, Tilting…