Client | ZE Energy Inc., Japan |
Location | Toyama Prefecture |
Sites | 1. Nimangoko Irrigation Scheme 2. Kobutamata River 3. Yamada River 4. Itadoni River 5. Mitani Rivers 6. Gyadani River 7. Wakatsuchi River |
Commissioned In | November 2014 |
Client | ZE Energy Inc., Japan |
Location | Toyama Prefecture |
Sites | 1. Nimangoko Irrigation Scheme 2. Kobutamata River 3. Yamada River 4. Itadoni River 5. Mitani Rivers 6. Gyadani River 7. Wakatsuchi River |
Commissioned In | November 2014 |
Venue: Kataragama, Kiri Vehera Date: 12-Jan-2017
Batathota Mini Hydro-power Project – 1.5 MW Batathota was completed by HPI in February 2007. The specialty of this project is HPI handled only the Electro Mechanical installations in Sri Lanka. The greatest challenge was to collaborate with different entities as there were many external parties involved with the project. Finally, we were able to…
Manelwala Mini Hydro-power Project – 2.4 MW Manelwala was completed by HPI in June 2008 as an EPC Contract. The main investor for the projects was Manelwala Hydro Power (Pvt)Ltd., which is same as Panasian Power (Pvt) Ltd. with joint investment with HPI and New Energy Ltd. in United Kingdom. Type of Contract Turn Key…
Organize Blood Donation Campaigns annually and motivate the community for such involvements.
Nyamyotsi Mini Hydropower Project – Stage I Nyamyotsi hydropower project is located in the Rugera Sector on Nyadihu District in the Western Rwanda. Previously this province was called as the Ruhengeri Province. This project was identified by the team of UNIDO and local experts in the year 2004 and it was developed by UNIDIO, which…
Conferment of a Computer Center for a Rural School “VIDULA COMPUTER CENTER” in collaboration with ENCO and DFCC Bank