| Client | ZE Energy Inc., Japan |
| Location | Toyama Prefecture |
| Sites | 1. Nimangoko Irrigation Scheme 2. Kobutamata River 3. Yamada River 4. Itadoni River 5. Mitani Rivers 6. Gyadani River 7. Wakatsuchi River |
| Commissioned In | November 2014 |





| Client | ZE Energy Inc., Japan |
| Location | Toyama Prefecture |
| Sites | 1. Nimangoko Irrigation Scheme 2. Kobutamata River 3. Yamada River 4. Itadoni River 5. Mitani Rivers 6. Gyadani River 7. Wakatsuchi River |
| Commissioned In | November 2014 |



Build Chambers in Kalawana Area, a really calming place boarded to Sinharaja Forest and offered to Meditative Buddhist Monks in November 2017.
Client Rural and Renewable Energy Agency, Republic of Liberia Capacity 2.5 MW Location Lofa County, Republic of Liberia Project Type Supply & Installation Remarks The contract is awarded to the JV of ENCO, HPI & FUSO
Client Kenya Tea Development Agency Holdings Limited, Republic of Kenya Capacity 1.8 MW Location Embu County, Republic of Kenya Project Type EPC
The isle of Sri Lanka is bountiful geography, blessed with many springs, rivers, and waterfalls that are nourished by the showers that pour throughout the year. As a pioneer in Renewable Energy Development, we have made use of our gifts from Mother Nature and transformed them into Hydropower Plants. Davora Capital Group has been in…
Nyamyotsi Mini Hydropower Project – Stage II Client UNIDO Location Nyadihu District, Republic of Rwanda Capacity [kW] 100 Beneficiaries 250 Households Transmission Voltage 400 V Distribution N/W 3km at 230V Channel Length 200 m Penstock Length 250 m Design Flow 90 Litre/sec Gross Head 120 m Commissioned in July 2012
Organize, lifestyle development and attitude build-up programmes for Government Officers and Semi-Government Sector Officers on the participation of reputed Professors and University Lecturers.