Client | ZE Energy Inc., Japan |
Location | Toyama Prefecture |
Sites | 1. Nimangoko Irrigation Scheme 2. Kobutamata River 3. Yamada River 4. Itadoni River 5. Mitani Rivers 6. Gyadani River 7. Wakatsuchi River |
Commissioned In | November 2014 |
Client | ZE Energy Inc., Japan |
Location | Toyama Prefecture |
Sites | 1. Nimangoko Irrigation Scheme 2. Kobutamata River 3. Yamada River 4. Itadoni River 5. Mitani Rivers 6. Gyadani River 7. Wakatsuchi River |
Commissioned In | November 2014 |
With the collaboration of “Terra People Association – Japan”, Hydro Power International has started awarding scholarships to 05 Students in Sanghamitta Girls’ College, Galle; each year since 1997. This was the period in which we started Operations of our Company. Those 05 students were selected from Grade 11 and we financially assisted them until they…
The feasibility study of Guinea Project was completed successfully and handed over by ENCO (Pvt) Ltd. This is also a project funded by UNIDO. The proposed dam of the Hydro Power plant across Makona River is situated close to the village called “Keno” in the city called Gueckedou. The Makona River finally falls into the…
Purpose; to introduce KUBOTA’s domestic sewerage treatment facility called Joukasou systems In the latter part of 2018, Fukada Environmental Development Industries Co., Ltd. (Japan), expressed interest in joining hands with us to introduce Japanese technology for sewerage/ kitchen water treatment facilities using KUBOTA’s technology which is the best in the world and affordable with good quality…
Wee Oya Mini Hydro-power Project – 6 MW Wee Oya is another successful mini hydro project developed by HPI for Power base Technology (Pvt) Ltd. and the second mini hydro plant developed by HPI with them. This clearly shows the confidence our clients have placed on us. The mother company of the Power base, Naturub…
We could win another competitive contract to upgrade the Nyamenga hydropower plant in the neighbouring nation of Burundi, from an existing capacity of 1.4 MW to 2.8 MW with two additional turbine-generator sets. This plant augmentation was successfully completed and commissioned in June 2009.
Representatives of “Terra People’s Association of Japan”, Ms. Ruri Okubo, Mr. Yamaji Kenzo, and 02 respectable donors including Mr. KasuoShingae visited Sri Lanka in March ’2016 to meet the scholarship holders of Shishyodaya Foundation. This event was successfully held with the participation of the…Principal of Sanghamitta College, Galle – Mrs. ChandaniUdakumbura, Teachers-In-Charge – Mrs. Chandima…