Venue: Kataragama, Kiri Vehera
Date: 12-Jan-2017





























The feasibility study of Guinea Project was completed successfully and handed over by ENCO (Pvt) Ltd. This is also a project funded by UNIDO. The proposed dam of the Hydro Power plant across Makona River is situated close to the village called “Keno” in the city called Gueckedou. The Makona River finally falls into the…
Rath Ganga Mini Hydropower Project – 2 MW Rath Gaga mini-hydro project with the capacity of 2 MW is a successful project completed by HPI in 2004 August. The significance of this project is that the main investors were from the UK. Overseas partners invested via a newly incorporated offshore company, New Energy Limited. This…
Gatubwe Mini Hydropower Project Client UNIDO Location Agatobe, Republic of Rwanda Capacity [kW] 200 Beneficiaries 350 Households Transmission Voltage 11 kV Distribution N/W 10km at 230V Channel Length 500 m Penstock Length 30 m Design Flow 1500 Litre/sec Gross Head 18 m Commissioned in July 2012
Maliboda Mini Hydro-power Project – 1 MW The proposed Maliboda Mini Hydro Power Project site utilizes the waters of Magal Ganga at Magala village in the Maliboda area in Deraniyagala Divisional secretariat Division in Kegalle District. The upper catchment boundary of the Magal Ganga extends up to an elevation of the app. 1,160 m MSL….
Factory Expansion of RSL Ceramics Due to the high demand for our ceramics bath ware products, we are now in the process of expanding our Factory with modern European technological aspects. This is a project worth LKR 100 Mn. which is handling by Hydro Power International (Private) Limited. Constructions are going on in a 01…
Dr.Nishantha Nanayakkara being an academic at the Moratuwa University of Sri Lanka attached to the Electrical Department found the necessity of inputs to society soon after he came back to Sri Lanka in 1995 after finishing all his post-graduate studies. 1996/97 had been the worst era of the electricity sector in Sri Lanka with 10-15…