| Client | ZE Energy Inc., Japan |
| Location | Toyama Prefecture |
| Sites | 1. Nimangoko Irrigation Scheme 2. Kobutamata River 3. Yamada River 4. Itadoni River 5. Mitani Rivers 6. Gyadani River 7. Wakatsuchi River |
| Commissioned In | November 2014 |





| Client | ZE Energy Inc., Japan |
| Location | Toyama Prefecture |
| Sites | 1. Nimangoko Irrigation Scheme 2. Kobutamata River 3. Yamada River 4. Itadoni River 5. Mitani Rivers 6. Gyadani River 7. Wakatsuchi River |
| Commissioned In | November 2014 |



Organize Blood Donation Campaigns annually and motivate the community for such involvements.
Client Kenya Tea Development Agency Holdings Limited, Republic of Kenya Capacity 1.8 MW Location Embu County, Republic of Kenya Project Type EPC
Construction of 220 kV Transmission Line Project from Habarana to Veyangoda
Venue: Matara Date: 22-Nov-2017
Client Ministry of Lands, Mines, and Energy, Republic of Liberia Sites 1. Jor River at Gbatala, Bong County 2. Du River at Kakata, Margibi County 3. Cestors River between Grand bassa and Sinoe Counties 4. St. John River at Gbedin, Nimba County 5. Dugbe River in River Gee County 6. Wozi Creek in Zorzor,…
Niriella Mini Hydropower Project – 3 MW Trailed by the success of the Kabaragala Mini Hydro Project, HPI was awarded to construct another Turnkey Project in Niriella by the Naturub Group of Companies. This project was commissioned in September 2002 with a total generating capacity of 3 MW. Power base Technology (Pvt) Ltd. is the…