A Project on Solar Power Systems at Veddagala Factory Premises, Kalawana.
| Capacity | 101.25 kW |
| Project Type | Supply. installation and Commissioning under Net Plus Scheme |
| Completion Year | 2018 |
| Solar Panel Provider & Technology Transfer | Alta Vision Solar |

A Project on Solar Power Systems at Veddagala Factory Premises, Kalawana.
| Capacity | 101.25 kW |
| Project Type | Supply. installation and Commissioning under Net Plus Scheme |
| Completion Year | 2018 |
| Solar Panel Provider & Technology Transfer | Alta Vision Solar |




Dr.Nishantha Nanayakkara being an academic at the Moratuwa University of Sri Lanka attached to the Electrical Department found the necessity of inputs to society soon after he came back to Sri Lanka in 1995 after finishing all his post-graduate studies. 1996/97 had been the worst era of the electricity sector in Sri Lanka with 10-15…
RSL Ceramics (Pvt) Ltd.(Delux) Is the leading manufacturer of premium quality ceramic bath ware products for the Sri Lankan market. They offer a wide range of sanitaryware products for affordable prices. Whether you are looking for the latest innovations, traditional or modern designs, vibrant colors, or international standards, RSL Ceramics is committed to providing you…
Maliboda Mini Hydro-power Project – 1 MW The proposed Maliboda Mini Hydro Power Project site utilizes the waters of Magal Ganga at Magala village in the Maliboda area in Deraniyagala Divisional secretariat Division in Kegalle District. The upper catchment boundary of the Magal Ganga extends up to an elevation of the app. 1,160 m MSL….
Provided financial assistance for the renovation of “Sri Wivekaramaya Temple” of MaditthaKumbura, Manakola and completely handled fixing electric lamps around the Temple area in the year 2019 & continuously monitor the electrical issues.
Client Ministry of Lands, Mines, and Energy, Republic of Liberia Sites 1. Jor River at Gbatala, Bong County 2. Du River at Kakata, Margibi County 3. Cestors River between Grand bassa and Sinoe Counties 4. St. John River at Gbedin, Nimba County 5. Dugbe River in River Gee County 6. Wozi Creek in Zorzor,…
Nyamyotsi Mini Hydropower Project – Stage II Client UNIDO Location Nyadihu District, Republic of Rwanda Capacity [kW] 100 Beneficiaries 250 Households Transmission Voltage 400 V Distribution N/W 3km at 230V Channel Length 200 m Penstock Length 250 m Design Flow 90 Litre/sec Gross Head 120 m Commissioned in July 2012