By expanding the wings of HPI, now we are into the sales of Value Added Tea which is manufactured in our own Tea Factories. We intend to send samples to Japan, Australia, China, Liberia & Pakistan and waiting to start over our business locally as well as internationally.
Similar Posts
Manelwala Project – 2.4 MW
ByadminManelwala Mini Hydro-power Project – 2.4 MW Manelwala was completed by HPI in June 2008 as an EPC Contract. The main investor for the projects was Manelwala Hydro Power (Pvt)Ltd., which is same as Panasian Power (Pvt) Ltd. with joint investment with HPI and New Energy Ltd. in United Kingdom. Type of Contract Turn Key…
Davora Tea (Private) Limited
ByadminDavora Tea was incorporated in 2015, aiming the local sales and exports of Ceylon Tea manufactured in our own Tea Factories. We have a strong bond with our respective Tea Brokers and we consult them as and when required, like when we need to go for perfect blends such as to maintain the quality and…
Sri Lanka visit by Burundi Govurment Officials
ByadminMinister of Community Development of Burundi – Jean Baptiste Gahimbare and Director General of Water Supply & Energy for Rural Areas in Burundi – Ndayitwayeko Fulgence inspected several Mini Hydropower Projects in Deraniyagala and Nawalapitiyain July 2005, to assess the developments in the hydropower sector in Sri Lanka before they sign the Agreement with UNIDO….
Manakola Project
ByadminManakola Mini Hydro-power Project – 2.5 MW This Project is an idea of Dr. Nanayakkara and his Engineering Team. This Power Plant is located in Hanguranketha DS Division in Nuwara Eliya District and the Water of Beliul Oya, which is a tributary of Mahaweli River, is used near Elamulla village in order to harness renewable…
Upper Korawak Oya Project – 1.5 MW
ByadminUpper Korawak Oya Mini Hydro-power Project – 1.5 MW Upper Korawak Oya hydro power project was developed by HPI for Santak Power (Pvt) Ltd. in Nawalapitiya. Project was successfully commissioned in January 2006 with the installed capacity of 1.5 MW. Upper Korawaka Oya is one of the five parallel projects handled between 2004-2005 by HPI….
Nyamyotsi Project – Stage II
ByadminNyamyotsi Mini Hydropower Project – Stage II Client UNIDO Location Nyadihu District, Republic of Rwanda Capacity [kW] 100 Beneficiaries 250 Households Transmission Voltage 400 V Distribution N/W 3km at 230V Channel Length 200 m Penstock Length 250 m Design Flow 90 Litre/sec Gross Head 120 m Commissioned in July 2012









